Urban development in the Oflyng residential area has resulted in a concentrated flow of storm water from the County of El Dorado (County) right-of-way (ROW) directed to pervious forested land as well as the Upper Truckee River. The hydrologic connectivity between Lake Tahoe and the Oflyng area results in a high to moderate potential to deliver fine sediment to Lake Tahoe. Storm water runoff will be directed into infiltration improvements providing a direct reduction in the transport of fine sediment to Lake Tahoe. It is also anticipated that urban storm water infrastructure will be upgraded to current design standards w/ conveyance improved to allow for proper flow sizing/routing.