Near South Lake Tahoe, from entrance to South Tahoe Airport to Route 89. Reconstruct drainage system and construct stormwater improvements throughout project area. Incorporate erosion control measures on unvegetated slopes within the State right-of-way. Pave existing unsurfaced pullouts and driveway connections. Caltrans EA 1A732. Length 1.7 miles. Post mile 73.7 to PM 75.4.

Completed
2013
2014
$12,100,000

Joan Davis (D3.FTIP@dot.ca.gov)
06/01/2014
01/13/2016
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
California Department of Transportation (Caltrans) Joan Davis - California Department of Transportation (Caltrans)

EIP Details

EIP Basics

01.01.01.0004 - US Highway 50 Water Quality Improvement Project - Lake Tahoe Airport to US 50/SR 89 Junction

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
Yes
Capital

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Roads Decommissioned or Retrofitted None miles

Reported Performance Measures

Reported Performance Measures
Miles of Pedestrian and Bicycle Routes Improved or Constructed
2014 Total Units
Action Performed Path or Route Type
Constructed Class II/Bike Lane 0.51 0.51 miles
Total 0.51 0.51 miles

Funding

Expected Funding

Expected Funding
$12,100,000
$12,100,000
$0

Total
Unknown or Unassigned $12,100,000 $12,100,000 $0
Grand Total $12,100,000 $12,100,000 $0

Reported Expenditures

Reported Expenditures
Total 2014 2013 2012
SHOPP Funds $4,457,497 $0 $3,536,497 $921,000
Grand Total $4,457,497 $0 $3,536,497 $921,000

Photos

Photos

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/31/2017 1:06 PM Jeanne McNamara Added the bike lane number to align with the RTP reporting. Caltrans previously did not report this as an accomplishment for this project.
10/30/2014 4:14 PM Jeanne McNamara All SHOPP funds for this project were reported previously during the 2006 EIP Accomplishments. Funds below were expended in the years but should not be counted to EIP totals as these funds were reported when the funding was secured:

2012 - $921,000
2013 - $3,536,497