Overview

Basics

Basics
In and near South Lake Tahoe, from Route 50 to Cascade Road. Reconstruct drainage system and construct stormwater improvements throughout project area. Incorporate erosion control measures on unvegetated slopes within the State right-of-way. Pave existing unsurfaced pullouts and driveway connections. Length = 5.2 miles. Post Mile 8.6 to PM 13.8. Caltrans EA 1A842. This project also removed an undersized, impassable culvert on Tallac Creek at Hwy 89 and replaced it with an open bottom culvert with natural substrate. The project removed the last remaining man-made barrier to fish on Tallac Creek, as well as provides improved stream habitat.

Completed
2006
2014
2016
$24,420,000

Joan Davis (D3.FTIP@dot.ca.gov)
06/07/2017
02/26/2018
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
California Department of Transportation (Caltrans) Joan Davis - California Department of Transportation (Caltrans)

EIP Details

EIP Basics

01.01.01.0006 - State Route 89 Water Quality Improvement Project - "Y" to Cascade Road

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
No
Capital

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Roads Decommissioned or Retrofitted None miles

Reported Performance Measures

Reported Performance Measures
Miles of Roads Decommissioned or Retrofitted
2015 2016 Total Units
Property Ownership Road Type Treatment Type
California Department of Transportation Paved Retrofitted 2 3 5 miles
Total 2 3 5 miles
Linear Feet of Stream Channel Restored or Enhanced
2015 2016 Total Units
Action Performed Watershed
Enhanced Tallac Creek 100 100 linear feet
Total 0 100 100 linear feet

No accomplishments to report for:
Year(s) 2014
Explanation No work completed in 2014

Funding

Expected Funding

Expected Funding
$24,420,000
$24,420,000
$0

Total
Unknown or Unassigned $24,420,000 $24,420,000 $0
Grand Total $24,420,000 $24,420,000 $0

Reported Expenditures

Reported Expenditures
Total 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007
SHOPP Funds $23,400,000 $20,968,000 $2,432,000 $0 $0 $0 $0 $0 $0 $0 $0
Grand Total $23,400,000 $20,968,000 $2,432,000 $0 $0 $0 $0 $0 $0 $0 $0

Photos

Photos

Other Details

Watersheds

Threshold Categories

  • This project removed a fish passage barrier and allows access to prime stream habitat
  • The stormwater and erosion control components of this project will help to limit sediment loading.

Local and Regional Plans

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
08/11/2016 9:48 AM Karen Fink Removed this from 2016 RTP because project is already underway and fully funded, and not in the current FTIP.