Overview

Basics

Basics
The South Demonstration Phase 1A Project is part of the Nevada Stateline to Stateline Bikeway. It includes a one mile segment of Class 1 path that originates at Stateline Avenue and Lake Parkway. The path follows Lake Parkway-West to US Highway 50 (Hwy 50), where it will align on the west side of the Hwy 50 until it reaches 4-H Camp Road where it connects with the completed Phase 1B path at Laura Drive. The Project also includes construction of a sidewalk along the east side of Hwy 50 between Lake Parkway-East and SR 207.

Planning/Design
2025
2026
2030
$5,500,000

01/20/2015
06/16/2025
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations

EIP Details

EIP Basics

03.02.02.0055 - Nevada Stateline to Stateline Bikeway Laura Drive to Stateline (Phase 1A)

This project is on the EIP 5-year list.

Transportation Details

Transportation Basics

Transportation Basics
Yes
Capital

Estimated Budgets

Estimated Budgets
/ Cost Type Total 2030 2029 2028 2027 2026 2025
Conserve NV (DCNR) $1,000,000
Preliminary Engineering $74,400 $0 $0 $0 $36,900 $37,500 $0
Construction $925,600 $0 $0 $0 $925,600 $0 $0
Surface Transportation Block Grant (STBG) - Nevada (FHWA) $1,593,224
Preliminary Engineering $750,000 $0 $0 $0 $0 $750,000 $0
Construction $843,224 $0 $0 $0 $843,224 $0 $0
Grand Total $2,593,224 $0 $0 $0 $1,805,724 $787,500 $0

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Pedestrian and Bicycle Routes Improved or Constructed None miles

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$5,500,000
$2,593,224
$2,906,776
($2,907,000 identified as )

Total
Conserve NV (DCNR) $1,000,000 $1,000,000 $0
Safe Streets and Roads for All (FHWA) $2,907,000 $0 $2,907,000
Surface Transportation Block Grant (STBG) - Nevada (FHWA) $1,593,224 $1,593,224 $0
Grand Total $5,500,224 $2,593,224 $2,907,000

Reported Expenditures

Reported Expenditures

No expenditures have been reported for this project.

Photos

Photos

No photos available.

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
04/23/2025 5:10 PM Tara Styer • Added Conserve Nevada $1M
• Added FY 2026 STBG- NV- Regional Grant Program (NVRGP2023-01) from Hwy 50 ($750,000 PE and $596,612 CON)
• Added FY 2025 STBG- NV - Regional Grant Program (NVRGP2023-01) from Hwy 50 ($246,612 CON)
01/26/2015 12:24 PM Derek Kirkland This Project is currently on hold as funding has not been identified for design or construction. Environmental approvals are completed for this Project. It may be possible that this Project ends up being designed and constructed with the US 50 South Shore Community Revitalization Project. The Project is still on TTD's radar, and if funding for design becomes available the Project will move forward with a goal of construction by 2018.