Overview

Basics

Basics
Phase 1A of the Nevada Stateline to Stateline Bikeway, South Demonstration Project, is a 1 mile segment extending the Laura Drive/Kahle (Phase 1B/1D) segments to Stateline along US 50 and then down Lake Parkway adjacent to Edgewood.

Deferred
2021
2023
2024
$3,000,000

01/20/2015
01/08/2021
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations

EIP Details

EIP Basics

03.02.02.0055 - Nevada Stateline to Stateline Bikeway Laura Drive to Stateline (Phase 1A)

Transportation Details

Transportation Basics

Transportation Basics
Yes
Capital

Estimated Budgets

Estimated Budgets
/ Cost Type Total 2024 2023 2022 2021
Nevada Transportation Alternatives Program (TAP) Funds (FHWA) $0
Preliminary Engineering $0 $0 $0 $0 $0
Grand Total $0 $0 $0 $0 $0

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Pedestrian and Bicycle Routes Improved or Constructed None miles

Reported Performance Measures

Reported Performance Measures

No annual performance measure accomplishments entered for this project.

Funding

Expected Funding

Expected Funding
$3,000,000
$0
$3,000,000

No funding sources identified for this project.

Reported Expenditures

Reported Expenditures

No expenditures have been reported for this project.

Photos

Photos

No photos available.

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/26/2015 12:24 PM Derek Kirkland This Project is currently on hold as funding has not been identified for design or construction. Environmental approvals are completed for this Project. It may be possible that this Project ends up being designed and constructed with the US 50 South Shore Community Revitalization Project. The Project is still on TTD's radar, and if funding for design becomes available the Project will move forward with a goal of construction by 2018.