Overview

Basics

Basics
This proposal funds the third phase of the Blackwood Channel and Floodplain Restoration Project. This project abandons a 1/2 mile section of stream channel that was channelized as a result of past land uses associated with a gravel quarry, and restore flows to an adjacent remnant of historic channel that is still largely intact. In addition 7 acres adjacent to the historic channel will be reshaped and stabilized.

Completed
2012
$2,833,000

Brian Garrett (brian.garrett@usda.gov)
06/01/2014
07/10/2015
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations

EIP Details

EIP Basics

01.02.01.0022 - Blackwood Creek Restoration Phase 3, Site B
27.9

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures
Linear Feet of Stream Channel Restored or Enhanced
2009 2012 Total Units
Action Performed Watershed
Enhanced Blackwood Creek 2,643 1,317 3,960 linear feet
Total 2,643 1,317 3,960 linear feet
Acres of Habitat Restored or Enhanced
2009 2012 Total Units
Action Performed Habitat Type
Restored SEZ/Wetland 5 22 27 acres
Total 5 22 27 acres

Funding

Expected Funding

Expected Funding
$2,833,000
$2,833,000
$0

Total
Unknown or Unassigned $2,833,000 $2,833,000 $0
Grand Total $2,833,000 $2,833,000 $0

Reported Expenditures

Reported Expenditures
Total 2012 2011 2010 2009
Southern Nevada Public Land Management Act $2,300,000 $500,000 $0 $0 $1,800,000
U.S. Forest Service $533,000 $0 $533,000 $0 $0
Grand Total $2,833,000 $500,000 $533,000 $0 $1,800,000

Photos

Photos

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
05/21/2014 6:03 PM System 2012: Reported funding for this project Phase 3A (Reach 6), and 3B (Reach 1)
05/21/2014 6:02 PM System Rd 9 (F127)
05/21/2014 6:01 PM System Reporting period from October 1, 2008 through September 30, 2009.