The objective of the overall project is to complete design and implementation of water quality protection BMPs and upgrades to meet recreational use standards at the Tallac Historic Site, Valhalla and Visitors Center. Upgrades can include building rehabilitation, water/sewer improvements and building replacement. Transportation improvements include the creation of a loop road interconnecting various sites, multimodal connections, bike paths and signage.

Implementation
2005
2013
2027
$11,100,000

Brian Garrett (brian.garrett@usda.gov)
12/27/2016
03/16/2023
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

03.01.02.0017 - Tallac Historic Site, Valhalla, and the Visitor Center Improvements
984

This project is on the EIP 5-year list.

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
No
Capital

Estimated Budgets

Estimated Budgets
/ Cost Type Total 2027 2026 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005
Surface Transportation Block Grant (STBG) - California (FHWA) $308,000
Preliminary Engineering $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $308,000 $0 $0 $0 $0 $0 $0 $0 $308,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Grand Total $308,000 $0 $0 $0 $0 $0 $0 $0 $308,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures
Facilities Improved or Created
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total Units
Action Performed Primary Facility Type Primary Purpose of Facility
Improved Buildings & Grounds Recreation 3 0 2 1 1 1 0 0 2 10 number
Improved Miscellaneous Structures Recreation 1 1 number
Total 3 0 2 1 1 1 1 0 0 2 11 number

Funding

Expected Funding

Expected Funding
$11,100,000
$5,804,628
$5,295,372
($201,000 identified as )

Total
Southern Nevada Public Land Management Act (USFS - LTBMU) $4,451,628 $4,451,628 $0
Surface Transportation Block Grant (STBG) - California (FHWA) $308,000 $308,000 $0
Tahoe Fund (Tahoe Fund) $83,000 $82,000 $1,000
U.S. Forest Service (USFS - LTBMU) $1,163,000 $963,000 $200,000
Grand Total $6,005,628 $5,804,628 $201,000

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007
Southern Nevada Public Land Management Act $4,451,628 $0 $0 $0 $0 $0 $0 $0 $0 $2,204,500 $500,000 $985,000 $243,328 $0 $18,800 $500,000 $0 $0
Surface Transportation Block Grant (STBG) - Califo... $308,000 $0 $308,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Tahoe Fund $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
U.S. Forest Service $963,000 $0 $0 $0 $0 $41,000 $43,000 $25,000 $80,000 $0 $0 $347,200 $365,800 $61,000 $0 $0 $0 $0
Grand Total $5,722,628 $0 $308,000 $0 $0 $41,000 $43,000 $25,000 $80,000 $2,204,500 $500,000 $1,332,200 $609,128 $61,000 $18,800 $500,000 $0 $0

Photos

Photos

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
03/16/2023 4:26 PM Judy Weber Project is removed from FTIP list. Project components have been completed. STBG $308,000 & Tahoe Fund $82,000
02/09/2023 1:06 PM Beth Vollmer Tahoe fund money is outside of the FTIP. Funding was for signage improvements at Taylor Creek
02/03/2023 9:43 AM Beth Vollmer Parking improvements at Kiva point and Valhalla.
02/08/2021 11:18 AM Beth Vollmer No work done in 2020
12/26/2019 1:29 PM Mike Gabor 2019 projects included Twin Cabin siding replacement
12/26/2019 1:28 PM Mike Gabor 2018 projects included electrical upgrades, irrigation system efficiency upgrades and building siding replacement.
12/26/2017 1:54 PM Mike Gabor Work in 2017 included the rehabilitation of the Valhalla Boathouse theatre water system including the installation of a back flow prevention device.
01/08/2016 3:28 PM Genevieve Villemaire The project has been funded by four SNPLMA grants thusfar. The first two grants laid the planning groundwork for the BMPs designed under the third grant, including NEPA analysis, survey work and permitting. Implementation of the designed BMP retrofit is funded under a fourth and final SNPLMA grant and implementation began on the North side of Hwy 89 in 2015. South side improvement implementation will start during 2016.
05/21/2014 6:01 PM System Round 9 BLM SNPLMA Project # F131. Project follows Round 5 SNPLMA Project - Camp Rich Vision Plan and Campgrounds BMP Retrofit. This project is first of three phases needed to complete the final planning and design for rehabilitation of the three campgrounds to current environmental protection standards.