Overview

Basics

Basics
The project area is comprised of three discontinuous segments from Cave Rock to the US 50/SR 28 intersection. Significant cut slopes exist throughout the project area and contribute a significant amount of sediment to stormwater. Slope stabilization options such as revegetation and soil/rock nailing and refacing will be evaluated through the alternative design process. In addition, facilities for the conveyance and treatment of stormwater will be evaluated and designed. The first phase of the project includes the stabilization of four cut slopes which were prioritized due to their sediment production and connectivity to stream systems.

Completed
2012
$7,945,000

Tyler Thew (tthew@dot.nv.gov.)
06/01/2014
02/23/2021
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

01.01.01.0051 - Highway 50 Water Quality Improvement Project Phase I

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
No
Capital

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures
Miles of Roads Decommissioned or Retrofitted
2012 Total Units
Property Ownership Road Type Treatment Type
Nevada Department of Transportation Paved Retrofitted 0.6 0.6 miles
Total 0.6 0.6 miles

Funding

Expected Funding

Expected Funding
$7,945,000
$7,945,000
$0

Total
Unknown or Unassigned $7,945,000 $7,945,000 $0
Grand Total $7,945,000 $7,945,000 $0

Reported Expenditures

Reported Expenditures
Total 2012 2011 2010 2009
Nevada Department of Transportation $870,000 $0 $870,000 $0 $0
Nevada State Gas Tax $310,000 $310,000 $0 $0 $0
Southern Nevada Public Land Management Act $875,000 $0 $300,000 $0 $575,000
U.S. Federal Highway Administration $5,890,000 $5,890,000 $0 $0 $0
Grand Total $7,945,000 $6,200,000 $1,170,000 $0 $575,000

Photos

Photos

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes

No notes entered.