Overview

Basics

Basics
The Christmas Valley Erosion Control Project - Phase 2B encompasses the streets of Cebo Circle, Keetak Street, Pomo Street, Cirugu Street, Minal Street, Wasabe Drive, Shakori Drive, Colusa Street, Han Street, and Blitzen Road. The main goals of the Project are related to improving the water quality of runoff to Lake Tahoe by reducing erosion and sediment flow originating in the Project area. The Project goals are remove/reduce fine sediment originating from the Project areas prior to reaching the Upper Truckee River to the maximum extent practicable. Remove/reduce coarse sediment originating from the Project areas prior to reaching the Upper Truckee River to the maximum extent practicable.

Completed
2010
2010
$730,300

Donaldo Palaroan (donaldo.palaroan@edcgov.us)
06/01/2014
07/22/2015
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

01.01.01.0064 - Christmas Valley Erosion Control Project - Phase 2B
708.2, 190

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
No
Capital

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures
Miles of Roads Decommissioned or Retrofitted
2010 Total Units
Property Ownership Road Type Treatment Type
El Dorado County Paved Retrofitted 0.24 0.24 miles
Total 0.24 0.24 miles
Miles of Street Sweeping
2010 Total Units
Equipment Type Property Ownership
High-Efficiency Vacuum-Assisted Dry Sweeper El Dorado County 0.36 0.36 miles
Total 0.36 0.36 miles

No accomplishments to report for:
Year(s) 2011, 2012, 2013, 2014, 2015
Explanation Implementation complete in 2010.

Funding

Expected Funding

Expected Funding
$730,300
$730,300
$0

Total
Unknown or Unassigned $730,300 $730,300 $0
Grand Total $730,300 $730,300 $0

Reported Expenditures

Reported Expenditures
Total 2013 2012 2011 2010
California Tahoe Conservancy $26,800 $0 $4,900 $6,400 $15,500
Southern Nevada Public Land Management Act $698,000 $0 $0 $491,000 $207,000
WQ Mitigation Funds $5,500 $5,500 $0 $0 $0
Grand Total $730,300 $5,500 $4,900 $497,400 $222,500

Photos

Photos

No photos available.

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes

No notes entered.