Overview

Basics

Basics
Stabilize roadside shoulders as a means of sediment source control to protect the newly constructed Bijou ECP Phase 1 infiltration basins. Provide distributed infiltration as a form of hydrologic source control, acquire easements and install overflow conveyances where localized flooding results in excessive sediment tracking onto City road network, in order to improve roadway sweeping effectiveness and source control.

Planning/Design
2015
2025
2026
$1,000,000

Stan Hill (shill@cityofslt.us)
01/27/2016
01/25/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
City of South Lake Tahoe (CSLT) Stan Hill - City of South Lake Tahoe (CSLT)

EIP Details

EIP Basics

01.01.01.0160 - Bijou Area Water Quality Improvement Project, Phases 2

This project is on the EIP 5-year list.

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

Benefit Category Question
Answer
Score
Questionnaire Score: 7.7

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$1,000,000
$0
$1,000,000

No funding sources identified for this project.

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019 2018 2017 2016 2015
City of South Lake Tahoe General Fund $10,000 $0 $0 $0 $0 $10,000 $0 $0 $0 $0
Grand Total $10,000 $0 $0 $0 $0 $10,000 $0 $0 $0 $0

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

No Threshold Categories set for this project.

Local and Regional Plans

Related Projects

Related Projects

01.01.01.0160 - Bijou Area Water Quality Improvement Project, Phases 2 is associated with following groups of projects.

External Links

Notes

Notes
01/11/2022 4:56 PM Jason Burke The project has been included in the 2021 Updated Drainage Master Plan https://www.cityofslt.us/342/Stormwater-Program. This project will address flooding issues and provide climate change resilience.