Overview

Basics

Basics
The Tahoe Beach Club is located on the site of the existing Tahoe Shores Mobile Home Park on the south shore of Lake Tahoe in Douglas County, Nevada. The project involves closure of the mobile home park, removal of the 155 existing mobile home spaces, realignment of the project site roadways and utilities, construction of new condominiums and construction of a beach and swim club, expansion of the existing pier, construction of stormwater treatment facilities, and SEZ restoration.

Implementation
2008
2016
2025
$1,469,193

Kat McIntyre (KMcIntyre@trpa.gov)
05/05/2016
02/09/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
KBM Enterprises (KBM) Kat McIntyre - Tahoe Regional Planning Agency (TRPA)
Nevada Energy (NV Energy) Kevin Lawson - Nevada Energy (NV Energy)
Private (Private) Kat McIntyre - Tahoe Regional Planning Agency (TRPA)

EIP Details

EIP Basics

01.02.01.0060 - Tahoe Beach Club Utility Undergrounding and SEZ Restoration

This project is on the EIP 5-year list.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Acres of SEZ Restored or Enhanced [Action Performed: Enhanced] acres
Tons of Greenhouse Gases Reduced [Type of Mitigation: Avoided Emissions] tons
Miles of Utility Lines Buried Underground [Scenic Roadway Unit: Airport Area] miles

Reported Performance Measures

Reported Performance Measures
Miles of Utility Lines Buried Underground
2019 Total Units
Scenic Roadway Unit Unit Attainment Status
Stateline Non-Attainment 0.07 0.07 miles
Total 0.07 0.07 miles

No accomplishments to report for:
Year(s) 2016, 2017, 2018, 2020, 2021, 2022, 2023
Explanation accomplishments reported in 2019, no accomplishments to report 2021-2023. SEZ work to start in 2024

Funding

Expected Funding

Expected Funding
$1,469,193
$1,469,193
$0

Total
Nevada Energy (NV Energy) $636,686 $636,686 $0
Private Property Owners (Private) $832,507 $832,507 $0
Grand Total $1,469,193 $1,469,193 $0

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008
Nevada Energy $636,686 $0 $0 $0 $0 $636,686 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Private (Business) $832,507 $0 $0 $0 $0 $832,507 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Grand Total $1,469,193 $0 $0 $0 $0 $1,469,193 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • Existing utility lines will be undergrounded
  • The proposed project would include restoration of approximately 2 acres of SEZ habitat along the northern portion of the project site adjacent to the United States Forest Service parcel and Burke Creek. The fill in this northern portion of the project site, originally placed over the SEZ when the airfield was constructed in the 1960s, would be removed to reestablish wetlands and SEZ habitat adjacent to Burke Creek. The eastern portion of the abandoned ditch on the northern border of the project site would be filled to assist with rehydrating the restored meadow;
  • After removal of the fill and restoration of the ditch, the restoration area would be planted with native plugs and riparian vegetation and all disturbed areas would be seeded with a native wetland seed mixture and mulched.
  • Surface runoff will be captured in a series of catch basins and roof runoff collected in dripline infiltration trenches would be directed to underground infiltration galleries. Runoff from driveways and parking areas would be pretreated via water quality treatment vaults. The proposed project would greatly reduce the pollutant loads from runoff compared with existing conditions. The reduction would be achieved through a reduction of approx. 99,052 sf of coverage, landscaping with improved infiltration capacity and installation of BMPs

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
02/04/2021 1:00 PM Beth Vollmer Acquired expenditure data and project update: NVE still has the final phase to complete of pulling the new wire through the underground conduit and vaults which are installed followed by removing the overhead structures and wires. They are scheduled to complete this work early in the upcoming construction season. It has already been paid for.
01/23/2019 11:18 AM Beth Vollmer Expenditures are private and therefore unknown