Overview

Basics

Basics
The project is located at the bottom of the Edgewood Creek watershed which drains an area of approximately 6.6 square miles. Mixed land uses within the watershed interrupted the natural hydrologic processes, and the resulting influx of nutrients and sediment degraded the quality of the watershed. This project included construction of a new 194-unit lodge complex and a series of environmental improvements including enhanced BMPs for the lodge complex, water quality improvements to the pond system, Edgewood Creek improvements, Friday’s Station dam rehabilitation, and undergrounding of existing overhead utility lines.

Completed
2013
2014
2016
$3,118,000

Kat McIntyre (KMcIntyre@trpa.gov)
05/13/2016
07/07/2021
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
Edgewood Companies (Edgewood) Kat McIntyre - Tahoe Regional Planning Agency (TRPA)

EIP Details

EIP Basics

01.02.01.0061 - Edgewood Lodge and Golf Course Improvement

Performance Measures

Expected Performance Measures

Expected Performance Measures
Linear Feet of Stream Channel Restored or Enhanced [Action Performed: Enhanced] 1373 linear feet
Acres of SEZ Restored or Enhanced [Action Performed: Enhanced] 4.6 acres
Acres of Habitat Restored or Enhanced [Action Performed: Enhanced] acres
Miles of Pedestrian and Bicycle Routes Improved or Constructed [Action Performed: Constructed] miles
Length of Public Shoreline Added [Length of Public Shoreline Added: General] 556 linear feet
Miles of Utility Lines Buried Underground [Scenic Roadway Unit: Airport Area] miles

Reported Performance Measures

Reported Performance Measures
Linear Feet of Stream Channel Restored or Enhanced
2014 2015 2016 Total Units
Action Performed Watershed
Restored Edgewood Creek 500 500 linear feet
Total 0 0 500 500 linear feet
Acres of SEZ Restored or Enhanced
2014 2015 2016 Total Units
Action Performed
Enhanced 1 1 acres
Restored 3.5 4.3 7.8 acres
Total 3.5 4.3 1 8.8 acres
Length of Public Shoreline Added
2014 2015 2016 Total Units
Length of Public Shoreline Added
General 425 425 linear feet
Total 0 0 425 425 linear feet
Miles of Utility Lines Buried Underground
2014 2015 2016 Total Units
Scenic Roadway Unit Unit Attainment Status
Stateline Non-Attainment 0.5 0.5 miles
Total 0 0 0.5 0.5 miles

Funding

Expected Funding

Expected Funding
$3,118,000
$3,118,000
$0

Total
Unknown or Unassigned $3,118,000 $3,118,000 $0
Grand Total $3,118,000 $3,118,000 $0

Reported Expenditures

Reported Expenditures
Total 2016 2015 2014 2013
Edgewood Companies $3,118,000 $1,117,000 $1,215,000 $786,000 $0
Grand Total $3,118,000 $1,117,000 $1,215,000 $786,000 $0

Photos

Photos

Other Details

Watersheds

Threshold Categories

  • This project will provide fish passage and create spawning habitat within the reach of Edgewood Creek from Lake Tahoe to pond 1. The main elements of this project are intended to improve stream habitat by daylighting the creek above the mouth, removing the culvert at the outfall, removing the golf cart path bridge, and re-contouring and stabilizing banks.
  • This project will provide active, water-oriented recreation open to the general public. Alternative 1 includes new on-site lakefront recreational amenities as part of the lodge complex, including a spa and wellness center, a newly designated 15,507-square foot sandy public beach, a public pier, food and beverage service, viewing decks, concessions (e.g., kayak and bicycle rentals), restrooms, open space, and a shared pedestrian/bicycle path that provides access from Lake Parkway to the beach.
  • Scenic Resources
  • Restoration of Golf Course Creek would result in a net increase of 53,028 square feet (1.22 acres) of SEZ.
  • This project will increase the area and improve the function of the Golf Course Creek and Edgewood Creek stream environment zones (SEZ); Dredge, remove, and relocate accumulated material in ponds 1, 6, 10, 12, and Friday’s Station pond; Improve the treatment efficiency of the pond system associated with the Stateline Stormwater Association Pond System (pond 6, pond 10, and wetland) and pond 1 on the golf course; Improve the treatment efficiency of Friday’s Station pond and mitigate the potential flood hazard associated with the existing dam.