Overview

Basics

Basics
This project proposes a Class 1 Bike and Ped trail along Rufus Allen Boulevard providing safe routes to school with access to the Al Tahoe Elementary School, Al Tahoe Middle School, St. Theresa School/Church, Boys and Girls Club, and the South Tahoe Middle School via a new trail connector across Lake Tahoe Unified School District property. Recreation facilities including the Recreation Center, Ice Arena, PlayFields, Running Track, Soccer Fields and the CTC Greenway will be accessed as well. Improvements along Rufus Allen Blvd are proposed to address urban stormwater water quality and flooding. Project begins at US Hwy 50 and Rufus Allen Bl and connects to the Al Tahoe Blvd Class 1 project.

Deferred
2023
2024
2025
$750,000

Jim Marino (jmarino@cityofslt.us)
12/04/2016
01/19/2022
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes
From Limits of US Hwy 50 to the North to approximately 100' west of City Recreation Center

Organizations

Organizations
City of South Lake Tahoe (CSLT) Stan Hill - City of South Lake Tahoe (CSLT)

EIP Details

EIP Basics

03.02.02.0080 - Middle School SR2S Project - Rufus Allen Connector

Transportation Details

Transportation Basics

Transportation Basics
No
Capital
$827,860 (Using 2.50% annual inflation)

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Pedestrian and Bicycle Routes Improved or Constructed [Action Performed: Constructed], [Path or Route Type: Class I/Shared Use Path] 0.7 miles
Pounds of Air Pollutants Removed or Avoided by Project [Pollutant of Concern: Carbon Monoxide (CO)] pounds
Tons of Greenhouse Gases Reduced [Type of Mitigation: Avoided Emissions] tons

Reported Performance Measures

Reported Performance Measures

No annual performance measure accomplishments entered for this project.

Funding

Expected Funding

Expected Funding
$750,000
$0
$750,000

No funding sources identified for this project.

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020
City of South Lake Tahoe General Fund $0 $0 $0 $0 $0
Grand Total $0 $0 $0 $0 $0

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • Encourage students and general population to bike or walk to educational and recreational facilities

Local and Regional Plans

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/15/2019 4:46 PM Chuck Taylor Potential funding sources include ATP (Active Transportation Program) and Prop 68 funding. Local match contributions for both programs will require budget commitments by City Council to qualify for these grants. Flood control and water quality treatment components may allow a larger scope of the project in order to be the best candidate for the Prop 68 grant administered by the CA Natural Resources Agency who will announce draft guidelines mid 2019.
11/30/2016 11:50 AM System Note - This project was referred to as Rufus Allen Boulevard Shared Use Path (SRTS) in the ATP
11/23/2016 3:06 PM System This project is not on the City's 5 year CIP plan as of November 2017. However, with the passage of Measure P which will fund the construction of a new Recreation Center within this project area, the City may look for an opportunity to design and implement the construction of this proposed trail with the construction of the recreation center pending budget analysis.