This project includes on-going Capital, Operations and Maintenance activities at the Lake Airport. This program is funded by the Airport Enterprise Fund operations budget and through grants from the Federal Aviation Administration and the State of California. These include forest fuel reduction and fire resilience in areas surrounding the airport, and habitat modification to reduce the likelihood of wildlife/aircraft collisions. All efforts are supported for regulatory compliance through a contract Registered Professional Forester and a contract Wildlife Biologist. Project completed on November 19, 2021.

Completed
2018
2018
2021
$628,894

Mark Gibbs (mgibbs@cityofslt.us)
12/22/2016
11/24/2021
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
California Department of Forestry and Fire Protection (Cal Fire) None
City of South Lake Tahoe (CSLT) Stan Hill - City of South Lake Tahoe (CSLT)

EIP Details

EIP Basics

02.01.01.0090 - South Lake Tahoe Airport Improvement Project

Transportation Details

Transportation Basics

Transportation Basics
No
Capital

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Linear Feet of Stream Channel Restored or Enhanced None linear feet
Pounds of Air Pollutants Removed or Avoided by Project None pounds
Facilities Improved or Created None number

Reported Performance Measures

Reported Performance Measures
Acres of Forest Fuels Reduction Treatment
2018 2019 2020 2021 Total Units
Initial or Maintenance Treatment Property Ownership Treatment Type Treatment Zone
Initial Local public lands (fire districts, counties, GIDs, PUDs, etc.) Hand Thinning Community Defense Zone 2 27.7 29.7 acres
Initial Local public lands (fire districts, counties, GIDs, PUDs, etc.) Mastication Community Defense Zone 46.1 37.7 83.8 acres
Total 46.1 37.7 2 27.7 113.5 acres
Tons of Greenhouse Gases Reduced
2018 2019 2020 2021 Total Units
Type of Mitigation
Avoided Emissions 384 384 384 384 1,536 tons
Total 384 384 384 384 1,536 tons

Funding

Expected Funding

Expected Funding
$628,894
$628,894
$0

Total
California Department of Forestry and Fire Protection (CAL FIRE) (Cal Fire) $179,951 $179,951 $0
Lake Tahoe Airport Enterprise Fund (CSLT) $448,943 $448,943 $0
Grand Total $628,894 $628,894 $0

Reported Expenditures

Reported Expenditures
Total 2021 2020 2019 2018
California Department of Forestry and Fire Protect... $179,951 $0 $0 $179,951 $0
Lake Tahoe Airport Enterprise Fund $448,943 $0 $104,688 $0 $344,255
Grand Total $628,894 $0 $104,688 $179,951 $344,255

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • This project improves air quality through various program components. Reconstruction of the aviation apron will improve operations and decrease emissions.
  • Realignment and enlargement of the west drainage ditch outfall will improve functionality of the adjacent creek.
  • This project improves water quality through various program components. Reconstruction of the aviation apron and realignment of Taxiway H will improve operations and decrease erosion into the adjacent creek. Realignment and enlargement of the west drainage ditch outfall will improve functionality of the adjacent creek.

Local and Regional Plans

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
11/19/2021 11:21 AM Mark Gibbs CCC project completed for removing trees less than 14" dbh. Burn piles awaiting 2 year cure period when CCC will secure a new contract from the City to burn woody materials. No trees were cut within the SEZ areas of airport property. These trees were left for another future contractor who can remove cut trees out of the SEZ.
11/04/2020 1:50 PM Mark Gibbs In 2020 the airport contracted with CCC to perform 79.11 acres of airspace obstruction prevention and hazardous fuel reduction on airport property. Due to an unprecedented California fire season the CCC was unable to deploy crews during the contract year; only accomplishing 2 acres of the 79.11 acres of treatment. The City hopes that the work can continue over the winter, spring and into next summer; resource permitting.
12/06/2018 8:38 AM Mark Gibbs 2018 West Airport Drainage Structure Maintenance Project prevents flooding and promotes filtration pond work cleaning sediments from Upper Truckee River

2018 LED fixture replacement. On-going effort to replace high wattage fixtures with LED components

2018 46.52 Acre Airport Hazardous Fuels Reduction project $331,000 project approved by City Council to remove hazardous fuels on airport property

2018 Staten Solar Power Purchase Agreement. Install 300.6 kWh rooftop solar array system at Lake Tahoe Airport

2018 General Aviation Ramp Reconstruction-Phase IV completed replacing 136,000 SF of existing aircraft apron. Installation of subsurface dewatering drain to improve water quality.