Overview

Basics

Basics
This project near Thunderbird lodge on Lake Tahoe's east shore proposes to restore a portion of Marlette Creek to improve stream function, water quality, and fish habitat and provide erosion control and stormwater treatment at directly connected outfalls from SR 28. Specifically (1) Capture and treat State Route 28 stormwater runoff prior to entering Marlette Creek by installing treatment at each stormwater outfall.(2) Repair incision and stabilize the bed of S. Fork of Marlette Creek and provide fish passage. (3) Provide fish passage at the SR 28 culvert. (4) Stabilize SR 28 shoulders, road embankments, and dirt parking areas that are directly connected (5) alleviate ponding on SR28.

Planning/Design
2017
2024
2025
$2,100,000

Meghan Kelly (mkelly@ntcd.org)
03/02/2017
02/14/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

01.01.01.0177 - Marlette Creek SR28 Crossing Realignment and Water Quality Improvement Project

This project is on the EIP 5-year list.

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Roads Decommissioned or Retrofitted [Property Ownership: Nevada Department of Transportation], [Road Type: Paved], [Treatment Type: Retrofitted] 1 miles
Linear Feet of Stream Channel Restored or Enhanced [Action Performed: Restored], [Watershed: Marlette Creek] 1000 linear feet

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$2,100,000
$2,100,000
$0

Total
Lake Tahoe Restoration Act (USFS - LTBMU) $1,800,000 $1,800,000 $0
Nevada Department of Transportation (NDOT) $300,000 $300,000 $0
Grand Total $2,100,000 $2,100,000 $0

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019 2018 2017
Lake Tahoe Restoration Act $168,166 $57,142 $48,278 $52,419 $10,327 $0 $0 $0
Nevada Tahoe Conservancy $1,500 $0 $0 $0 $0 $0 $500 $1,000
Grand Total $169,666 $57,142 $48,278 $52,419 $10,327 $0 $500 $1,000

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • Project will realign a portion of Marlette Creek to route it away from an eroding road embankment and restore floodplain access on both sides of the creek.
  • Project will disconnect sediment laden road runoff from Marlette Creek by installing stormwater treatment

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

01.01.01.0177 - Marlette Creek SR28 Crossing Realignment and Water Quality Improvement Project is associated with following groups of projects.

External Links

No external links entered.

Notes

Notes

No notes entered.