Restoration of Saxon Creek targeting the eroding channel, removal of a fish passage barrier, and restoration of three meadows. The watershed above the road is no longer connected to the floodplain due to previous land uses and conifer encroachment. The project includes NEPA and permitting. This restoration project will occur in three phases. Phase 1: Completed 2018. Replacement of aquatic organism passage barrier at Fountain Place Road. Phase 2: Completed 2022, Adapt. Mgmt 2023. Restore 1,000 feet of channel and floodplain upstream and downstream of the bridge installation area. Phase 3: Channel and meadow restoration in three meadows (60 acres total). Anticipated implementation 2026.

Implementation
2018
2018
2026
$4,000,000

Theresa Cody (theresa.cody@usda.gov)
01/03/2018
01/19/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

01.02.01.0084 - Saxon Creek Restoration

This project is on the EIP 5-year list.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Linear Feet of Stream Channel Restored or Enhanced None 450 linear feet
Acres of SEZ Restored or Enhanced None 4 acres

Reported Performance Measures

Reported Performance Measures
Linear Feet of Stream Channel Restored or Enhanced
2018 2022 2023 Total Units
Action Performed Watershed
Enhanced Trout Creek 250 250 linear feet
Restored Trout Creek 1,000 1,000 linear feet
Total 0 1,000 250 1,250 linear feet
Acres of SEZ Restored or Enhanced
2018 2022 2023 Total Units
Action Performed
Enhanced 2 2 acres
Restored 5 5 acres
Total 0 5 2 7 acres
Facilities Improved or Created
2018 2022 2023 Total Units
Action Performed Primary Facility Type Primary Purpose of Facility
Improved Trails & Paths Recreation 1 1 number
Total 1 0 0 1 number

No accomplishments to report for:
Year(s) 2019, 2020, 2021
Explanation After bridge installation, the project went back into the planning phase for channel restoration adjacent to the bridge (including NEPA and design development). No accomplishments were made during this time.

Funding

Expected Funding

Expected Funding
$4,000,000
$2,950,000
$1,050,000

Total
Lake Tahoe Restoration Act (USFS - LTBMU) $950,000 $950,000 $0
U.S. Forest Service (USFS - LTBMU) $2,000,000 $2,000,000 $0
Grand Total $2,950,000 $2,950,000 $0

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019 2018
Lake Tahoe Restoration Act $950,000 $45,000 $835,000 $55,000 $15,000 $0 $0
U.S. Forest Service $2,000,000 $0 $0 $0 $0 $0 $2,000,000
Grand Total $2,950,000 $45,000 $835,000 $55,000 $15,000 $0 $2,000,000

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • replace/improve AOP barrier
  • improve hydrologic connectivity and channel performance
  • reduce stream bank erosion and increase flood plain sediment trapping capability.

Local and Regional Plans

Related Projects

Related Projects

01.02.01.0084 - Saxon Creek Restoration is associated with following groups of projects.

External Links

No external links entered.

Notes

Notes
01/11/2024 4:58 PM Theresa Cody The restoration work for Phase 2 was completed in 2022, however the large winter and spring flow events following construction led to the need for adaptive management work in 2023. The LTBMU completed the adaptive management work in 2023 in-house, and all post-project permit monitoring was also completed. Only the upper meadow restoration work in Phase 3 is remaining.
01/14/2020 1:27 PM Beth Vollmer Culvert acting as a barrier to Aquatic Organism Passage replaced with a bridge resembling a natural stream channel and Saxon Creek and Fountain Place Road.