Restore 2,500 feet of stream and floodplain by strategic placement of large wood structures and boulders. Three sections of stream were identified in September 2017 Impacts were in response to multiple floods occurring over the winter of 2016/17. Two floods exceeded 20-year flood levels. Projects are located in untreated areas. Floods caused stream incision, bank erosion and sinuosity loss.

Planning/Design
2019
2026
2027
$1,000,000

Robert Gibson (robert.gibson@usda.gov)
01/05/2018
01/10/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

01.02.01.0085 - Blackwood Creek Restoration Phase 4

This project is on the EIP 5-year list.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Linear Feet of Stream Channel Restored or Enhanced None 1500 linear feet

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$1,000,000
$0
$1,000,000
($1,000,000 identified as )

Total
Lake Tahoe Restoration Act (USFS - LTBMU) $1,000,000 $0 $1,000,000
Grand Total $1,000,000 $0 $1,000,000

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019
Southern Nevada Public Land Management Act $10,000 $10,000 $0 $0 $0 $0
U.S. Forest Service $0 $0 $0 $0 $0 $0
Grand Total $10,000 $10,000 $0 $0 $0 $0

Photos

Photos

No photos available.

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • Restoring spawning and rearing habitat.
  • Reduce bank erosion, increase floodplain sediment storage.
  • Improve floodplain and channel sediment trapping capabilities.

Local and Regional Plans

Related Projects

Related Projects

01.02.01.0085 - Blackwood Creek Restoration Phase 4 is associated with following groups of projects.

External Links

No external links entered.

Notes

Notes
01/09/2024 10:34 AM Robert Gibson SNPLMA funds used for planning under Lake Tahoe West EA.