Pavement rehabilitation and new asphalt concrete overlay of Elks Club Drive from Boca Raton to Pioneer Trail were installed with this project. Included the construction of rolled curb and gutter from Pioneer Trail to Skyline drive which provides roadway widths for vehicles and bicycles, while eliminating sharp drop-offs at existing edge of road AC swales. The project established Elks Club Drive as a Class III bike route and allowed for a connection from the future Greenway Bike Trail Project. The Greenway is currently planned to cross Elks Club Drive near Boca Raton.

Completed
2017
2018
2019
$1,000,000

Dan Kikkert (dan.kikkert@edcgov.us)
03/07/2018
01/05/2021
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
El Dorado County, CA (ELDO) Donaldo Palaroan - El Dorado County, CA (ELDO)

EIP Details

EIP Basics

01.01.01.0183 - Elks Club Drive Capital Overlay Rehabilitation Project

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
No
Capital

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Pedestrian and Bicycle Routes Improved or Constructed None miles

Reported Performance Measures

Reported Performance Measures
Miles of Roads Decommissioned or Retrofitted
2018 Total Units
Property Ownership Road Type Treatment Type
El Dorado County Paved Retrofitted 0.81 0.81 miles
Total 0.81 0.81 miles
Miles of Street Sweeping
2018 Total Units
Equipment Type Property Ownership
High-Efficiency Vacuum-Assisted Dry Sweeper El Dorado County 0.81 0.81 miles
Total 0.81 0.81 miles

No accomplishments to report for:
Year(s) 2019
Explanation Project was constructed in 2018.

Funding

Expected Funding

Expected Funding
$1,000,000
$1,000,000
$0

Total
El Dorado County General Fund (ELDO) $1,000,000 $1,000,000 $0
Grand Total $1,000,000 $1,000,000 $0

Reported Expenditures

Reported Expenditures
Total 2019 2018 2017
El Dorado County General Fund $829,257 $766,148 $61,109 $2,000
Grand Total $829,257 $766,148 $61,109 $2,000

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • After roadway improvements are complete, striping of the roadway will allow for safer transit of bicycles from Highway 50 to Pioneer Trial on Elks Club Drive. May lead to increased use of bicycles through this area.
  • Once completed the work will establishing Elks Club Drive as a Class III bike route and allow for a connection from the future Greenway Bike Trail Project. The Greenway is currently planned to cross Elks Club Drive near Boca Raton.
  • Improvements to the existing roadway, including construction of rolled curb and gutter. These improvements will help with the quality of stormwater runoff from travelway surfaces by enabling the maintenance department to sweep/vacuum roadside conveyance systems.

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/18/2018 8:05 AM Dan Kikkert This project is consistent with the 2017 Regional Transportation Plan under the following constrained list grouped projects.
Street and Roads Operations and Maintenance
Bike and Pedestrian Projects from Active Transportation Plan 2012-2030.

Project has been identified/associated with:
1) Country Club Heights Stormwater Management and Erosion Control Project (01.01.01.0021); and
2) South Tahoe Greenway Shared Use Trail Planning and Future Phases (03.01.02.0088)