NTPUD owns the Carnelian Bay water system on the north shore of Lake Tahoe which is located at the wildland urban interface in North Tahoe. There are approximately 300 residential and commercial customers in this system. There was an existing 2,500 linear foot 2-inch diameter watermain that was deficient in fire flows with no fire hydrants. This watermain has been replaced with a new 3,500 linear foot 12-inch watermain with fire hydrants spaced at 500 feet along NLB. The new watermain was extended to the Fulton Water System boundary for a future intertie connection for reliability and redundancy of water supply. This is a high-capacity intertie at 12-inches in diameter.

Completed
2019
2022
2023
$3,300,000

Suzi Gibbons (sgibbons@ntpud.org)
02/16/2018
12/13/2023
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes
Plot point on map is center of project area. Project area is from 39.2258, -120.0836 to 39.2185, -120.0871.

Organizations

EIP Details

EIP Basics

02.01.03.0004 - Carnelian Bay Fire Protection Water Infrastructure

Performance Measures

Expected Performance Measures

Expected Performance Measures
Facilities Improved or Created None number

Reported Performance Measures

Reported Performance Measures

No annual performance measure accomplishments entered for this project.


No accomplishments to report for:
Year(s) 2022, 2023
Explanation There are not currently performance measures for updates to water infrastructure for fire protection.

Funding

Expected Funding

Expected Funding
$3,300,000
$3,300,000
$0

Total
Lake Tahoe Restoration Act (USFS - LTBMU) $536,302 $536,302 $0
North Tahoe Public Utility District (NTPUD) $2,763,698 $2,763,698 $0
Grand Total $3,300,000 $3,300,000 $0

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019
Lake Tahoe Restoration Act $536,302 $0 $536,302 $0 $0 $0
North Tahoe Public Utility District $2,763,698 $0 $2,763,698 $0 $0 $0
Grand Total $3,300,000 $0 $3,300,000 $0 $0 $0

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • This project will increase response to catastrophic wildfire by installing fire hydrants in an area that has no fire suppression capabilities, installing large diameter water main to support fire hydrants, and installing inter-tie provisions for future interconnection with neighboring water company for improved fire suppression capabilities/

Local and Regional Plans

Related Projects

Related Projects

02.01.03.0004 - Carnelian Bay Fire Protection Water Infrastructure is associated with following groups of projects.

External Links

No external links entered.

Notes

Notes
11/21/2022 10:42 AM Beth Vollmer In 2022, approximately 3,000 linear feet of 12-inch watermain was installed, including 6 new fire hydrants and a gate valve for a future intertie connection.