To complete basin maintenance and upgrades to two Douglas County maintained stormwater basins within the Tahoe basin. Both basins are located on property owned by the U.S. Forest Service with an easement provided to Douglas County to operate these basins. The basins proposed for maintenance are located at Donna Way and Scott Drive (APN 1319-18-301-001) and Kingsbury Grade and North Benjamin Drive (APN 1319-19-202-002). Due to sediment accumulation and vegetation growth the basins no longer hold their original design volume of stormwater. This project will remove the accumulated sediment and vegetation, restore original basin geometry, and construct a hard articulated block basin bottom.

Completed
2017
2019
2019
$160,000

Courtney Walker (cwalker@douglasnv.us)
05/05/2018
02/10/2020
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
Douglas County, NV (DGCO) Courtney Walker - Douglas County, NV (DGCO)
Tahoe Regional Planning Agency (TRPA) Kat McIntyre - Tahoe Regional Planning Agency (TRPA)

EIP Details

EIP Basics

01.01.01.0185 - Douglas County Basin Maintenance and Upgrades - Kingsbury Grade/North Benjamin and Donna/Scott Way

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures

No annual performance measure accomplishments entered for this project.

Funding

Expected Funding

Expected Funding
$160,000
$160,000
$0

Total
Douglas County General Fund (DGCO) $80,000 $80,000 $0
WQ Mitigation Funds (TRPA) $80,000 $80,000 $0
Grand Total $160,000 $160,000 $0

Reported Expenditures

Reported Expenditures
Total 2019 2018 2017
Douglas County General Fund $80,000 $80,000 $0 $0
TRPA Operations & Maintenance Funds $80,000 $80,000 $0 $0
Grand Total $160,000 $160,000 $0 $0

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • Due to sediment accumulation and vegetation growth the basins no longer hold their original design volume of stormwater. This project will remove the accumulated sediment and vegetation, restore original basin geometry, and construct a hard articulated block basin bottom so that the basin will maintain its geometry and future sediment removal can be accomplished by Douglas County forces.

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/02/2020 8:15 AM Courtney Walker Project was completed in August 2019.
01/07/2019 8:30 AM Courtney Walker This project was put out to bid in June 2018. No bids were received, therefore it will be put out again in the Spring of 2019. Funding is secured.