Overview

Basics

Basics
Construction of a water tank to increase water storage capacity by 150,000 gallons. This will increase fire protection and the ability to protect land during catastrophic wildfire .

Planning/Design
2019
2025
2027
$900,000

Andrew Hickman (andrew@rhgid.org)
03/17/2020
02/27/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes
Adjacent to existing tank

Organizations

EIP Details

EIP Basics

02.01.03.0008 - Round Hill Fire Protection Water Infrastructure Tank

This project is on the EIP 5-year list.

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$900,000
$0
$900,000
($900,000 identified as )

Total
Lake Tahoe Restoration Act (USFS - LTBMU) $900,000 $0 $900,000
Grand Total $900,000 $0 $900,000

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019
Lake Tahoe Restoration Act $0 $0 $0 $0 $0 $0
Grand Total $0 $0 $0 $0 $0 $0

Photos

Photos

No photos available.

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

Local and Regional Plans

Related Projects

Related Projects

02.01.03.0008 - Round Hill Fire Protection Water Infrastructure Tank is associated with following groups of projects.

External Links

No external links entered.

Notes

Notes

No notes entered.