The project modified the intersection of US 50 at Warrior Way by adding traffic signalization and pedestrian crossing infrastructure. The project also proposes to construct a storm drain to capture and convey roadway runoff to a proposed water quality basin.

Implementation
2018
2023
2024
$3,175,000

Chris Holman (cholman@dot.nv.gov)
04/15/2021
02/27/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations

EIP Details

EIP Basics

01.01.01.0199 - US 50 at Warrior Way Safety and Drainage Improvements

This project is on the EIP 5-year list.

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
Yes
Capital

Estimated Budgets

Estimated Budgets
/ Cost Type Total 2024 2023 2022 2021 2020 2019 2018
National Highway Performance Program (FHWA) $2,916,500
Preliminary Engineering $0 $0 $0 $0 $0 $0 $0 $0
Construction $2,916,500 $0 $0 $2,916,500 $0 $0 $0 $0
Nevada State Gas Tax (NDOT) $258,500
Preliminary Engineering $85,000 $0 $0 $0 $0 $0 $0 $85,000
Right of Way (aka Land Acquisition) $20,000 $0 $0 $0 $20,000 $0 $0 $0
Construction $153,500 $0 $0 $153,500 $0 $0 $0 $0
Grand Total $3,175,000 $0 $0 $3,070,000 $20,000 $0 $0 $85,000

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Roads Decommissioned or Retrofitted [Property Ownership: Nevada Department of Transportation], [Road Type: Paved], [Treatment Type: Retrofitted] 0.5 miles

Reported Performance Measures

Reported Performance Measures
Miles of Roads Decommissioned or Retrofitted
2023 Total Units
Property Ownership Road Type Treatment Type
Nevada Department of Transportation Paved Retrofitted 0.9 0.9 miles
Total 0.9 0.9 miles

Funding

Expected Funding

Expected Funding
$3,175,000
$3,175,000
$0

Total
National Highway Performance Program (FHWA) $2,916,500 $2,916,500 $0
Nevada State Gas Tax (NDOT) $258,500 $258,500 $0
Grand Total $3,175,000 $3,175,000 $0

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019 2018
National Highway Performance Program $2,397,434 $2,397,434 $0 $0 $0 $0 $0
Nevada State Gas Tax $488,928 $121,471 $9,317 $127,220 $55,045 $102,366 $73,509
Grand Total $2,886,362 $2,518,905 $9,317 $127,220 $55,045 $102,366 $73,509

Photos

Photos

No photos available.

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • The project proposes to capture and convey roadway runoff to a water quality basin prior to discharge.

Local and Regional Plans

Related Projects

Related Projects

01.01.01.0199 - US 50 at Warrior Way Safety and Drainage Improvements is associated with following groups of projects.

External Links

No external links entered.

Notes

Notes

No notes entered.