Replacement of 330 linear feet of 6-inch water main with new 8-inch water main and replacement of one fire hydrant to meet NLTFPD code requirements. This project is a continuation of the multi-year program to replace 1960's era thin wall steel water mains and other deficient water mains. Replacement criteria is twofold: Replace those water mains with the most leaks and in streets with aging pavement. Since our water loss is now less than 6%, our main objective is to work closely with the Washoe County Road Department to replace water mains just prior to the County's repaving the street. Project enhances fire protection capabilities on private, local, state, and federal lands.

Completed
2021
2022
2022
$275,000

HUDSON KLEIN (hwk@ivgid.org)
06/12/2022
02/06/2023
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes
tie-in along Lakeshore (170LF) Blvd and full replacement up Slott Peak Ct (170LF). New FH added

Organizations

Organizations
Incline Village General Improvement District (IVGID) HUDSON KLEIN - Incline Village General Improvement District (IVGID)

EIP Details

EIP Basics

02.01.03.0019 - Slott Peak Waterline Improvements

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures

No annual performance measure accomplishments entered for this project.


No accomplishments to report for:
Year(s) 2022
Explanation There are currently no performance measures for water infrastructure improvements.

Funding

Expected Funding

Expected Funding
$275,000
$275,000
$0
($137,500 identified as )

Total
Incline Village General Improvement District (IVGID) $412,500 $275,000 $137,500
Grand Total $412,500 $275,000 $137,500

Reported Expenditures

Reported Expenditures
Total 2022 2021
Incline Village General Improvement District $200,000 $200,000 $0
Grand Total $200,000 $200,000 $0

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/09/2023 8:35 AM HUDSON KLEIN The project was fully constructed from May-July 2022. Project complete and road restoration completed by Washoe County.

Project closed.
06/09/2022 1:16 PM HUDSON KLEIN The regional project benefit results from providing an
increased pipe diameter and eliminating known system
leakage that will ultimately increase available flow volumes
and water supply reliability on a critical water main along
a primary collector road. The project also includes
replacement of an out of date fire hydrant that services the
adjacent areas.