Overview

Basics

Basics
Hundreds of fire hydrants within IVGID were installed >40years ago and are no longer in compliance with current NLTPFD adopted IFC code requirements and standard operating guidelines. The increasing age also means replacement parts are no longer available for certain manufacturer models. Replacement criteria is based on a priority basis determined cooperatively by IVGID and NLTFPD. The project aims to replace hydrants no longer suitable for continued maintenance and to modify hydrants that can be salvaged and updated to meet current code requirements. Project improves water supply enhancing fire protection capabilities on private, local, state, and federal lands by increasing fire flow volum

Planning/Design
2022
2024
2026
$750,000

HUDSON KLEIN (hwk@ivgid.org)
06/10/2022
01/03/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes
The EIP subject project fire hydrants are located throughout the entire Incline Village and Crystal Bay area.

Organizations

Organizations
Incline Village General Improvement District (IVGID) HUDSON KLEIN - Incline Village General Improvement District (IVGID)

EIP Details

EIP Basics

02.01.03.0018 - IVGID Fire Hydrant Replacement Program

This project is on the EIP 5-year list.

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$750,000
$0
$750,000
($750,000 identified as )

Total
Incline Village General Improvement District (IVGID) $375,000 $0 $375,000
Lake Tahoe Restoration Act (TRPA) $375,000 $0 $375,000
Grand Total $750,000 $0 $750,000

Reported Expenditures

Reported Expenditures
Total 2023 2022
Incline Village General Improvement District $0 $0 $0
Grand Total $0 $0 $0

Photos

Photos

No photos available.

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • Improved fire protection infrastructure to improve fire fighting capacity in the event of a catastrophic wildfire

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/03/2024 2:25 PM HUDSON KLEIN Design and funding sources not finalized. Ongoing project development is in process.
06/09/2022 1:27 PM HUDSON KLEIN Throughout the district, the aging FH infrastructure requires a maintenance program not sustainable with available IVGID resource. The project will ensure hydrants throughout Incline Village and Crystal Bay will remain reliable and reduce the risk of failing hydrant operation in event of an emergency.