IVGID’s Burnt Cedar property currently receives storm water that enters the property during precipitation and snowmelt events. This water enters the property through an 18-inch CMP culvert and comes exclusively from the Washoe County roadway swales. Currently, the only BMP is the grass area adjacent to the culvert. There are no permanent BMP’s to slow the stormwater and stop sediment from entering the lake. This also results in beach sections being washed out as the water flows down the property. IVGID proposes a permanent BMP system in which this storm water is controlled and will slow the rate of water allowing the sediment to drop out of the water prior to it entering the lake.

Planning/Design
2022
2025
2026
$250,000

HUDSON KLEIN (hwk@ivgid.org)
07/19/2022
01/11/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes
18" CMP outlets Lakeshore Blvd water to Burnt Cedar Beach

Organizations

Organizations
Incline Village General Improvement District (IVGID) HUDSON KLEIN - Incline Village General Improvement District (IVGID)

EIP Details

EIP Basics

01.01.01.0207 - Burnt Cedar Beach - Lakeshore Blvd Stormwater BMPs

This project is on the EIP 5-year list.

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Roads Decommissioned or Retrofitted None miles

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$250,000
$0
$250,000
($250,000 identified as )

Total
Incline Village General Improvement District (IVGID) $62,500 $0 $62,500
Unknown or Unassigned $187,500 $0 $187,500
Grand Total $250,000 $0 $250,000

Reported Expenditures

Reported Expenditures
Total 2023 2022
Incline Village General Improvement District $0 $0 $0
Grand Total $0 $0 $0

Photos

Photos

No photos available.

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • The project proposes to install permanent BMPs to treat stormwater runoff discharged into IVGID land from the Washoe County road network along Lakeshore Blvd

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/04/2024 4:50 PM HUDSON KLEIN IVGID will collaborate with Washoe County as this storm drain is likely to be included in future watershed improvement projects. No known plan at the time of this update is in development.