The Tahoe Main water system in Kings Beach, CA is deficient in fire flows and in the number and spacing of fire hydrants and does not meet current fire codes on several streets in the grid. This project installed 7,700 linear feet of new 8-inch watermain in Golden Ave., Rainbow Ave., and upper Secline Street to replace the existing 1- and 2-inch diameter steel watermain that served the properties. Twelve new fire hydrants have been installed that are accessible from the public right of way. The project improved water supply enhancing fire protection capabilities on private, local, state, and federal lands by increasing fire flow volumes and coverage.

Completed
2021
2023
2023
$5,000,000

Suzi Gibbons (sgibbons@ntpud.org)
03/08/2023
12/01/2023
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

02.01.03.0022 - Golden and Rainbow Fire Protection Water Infrastructure

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures

No annual performance measure accomplishments entered for this project.


No accomplishments to report for:
Year(s) 2023
Explanation There are not currently performance measures for updates to water infrastructure for fire protection.

Funding

Expected Funding

Expected Funding
$5,000,000
$5,000,000
$0
($5,000,000 identified as )

Total
Lake Tahoe Restoration Act (USFS - LTBMU) $4,183,492 $1,683,492 $2,500,000
North Tahoe Public Utility District (NTPUD) $5,816,508 $3,316,508 $2,500,000
Grand Total $10,000,000 $5,000,000 $5,000,000

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021
Lake Tahoe Restoration Act $1,683,492 $1,683,492 $0 $0
North Tahoe Public Utility District $3,316,508 $3,316,508 $0 $0
Grand Total $5,000,000 $5,000,000 $0 $0

Photos

Photos

No photos available.

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • The project will install 7,700 feet of 8-inch watermains, improve system looping and add 12 new fire hydrants along Golden and Rainbow Avenues to comply with the California Fire Code. Water modeling of the proposed improvements calculate greater than 4,000 gpm of available fire flow after project completion.

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes

No notes entered.