Overview

Basics

Basics
This is a water quality improvement project located in Incline Village. The area is highly connected to Lake Tahoe and is a priority treatment area due to a relatively large baseline FSP load. The project proposes to install stormwater treatment BMPs and shoulder stabilization within the existing Washoe County right-of-way and undeveloped public parcels, providing treatment for urban stormwater runoff to meet the Lake Tahoe TMDL. This project is on the 5-year list. Once funding is secured, Washoe County intends to hire a consultant and begin planning and design of this project in 2025.

Planning/Design
2026
2027
2028
$900,000

Domi Fellers (dfellers@ntcd.org)
02/28/2023
12/08/2023
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
Washoe County, NV (WACO) Dave Solaro - Washoe County, NV (WACO)

EIP Details

EIP Basics

01.01.01.0211 - Burnt Cedar/Lakeshore Blvd Water Quality Improvement Project

This project is on the EIP 5-year list.

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Roads Decommissioned or Retrofitted [Property Ownership: Washoe County], [Road Type: Paved], [Treatment Type: Retrofitted] 0.25 miles
Acres of SEZ Restored or Enhanced [Action Performed: Enhanced] 7 acres

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$900,000
$0
$900,000
($900,000 identified as )

Total
Lake Tahoe Restoration Act (USFS - LTBMU) $320,000 $0 $320,000
Tahoe Bonds Act (NDSL) $500,000 $0 $500,000
Washoe County General Fund (WACO) $55,000 $0 $55,000
WQ Mitigation Funds (TRPA) $25,000 $0 $25,000
Grand Total $900,000 $0 $900,000

Reported Expenditures

Reported Expenditures

No expenditures have been reported for this project.

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • The project will install stormwater treatment designed to reduce sediment and nutrients from entering Lake Tahoe

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes

No notes entered.