Overview

Basics

Basics
The project includes installation of a new storm drain junction box at an existing NDOT outlet located upslope of 699 Hogan Court and approximately 440 linear feet of underground storm drain pipe, connecting to the existing storm drain system at the intersection of Hogan Court and Titlist Drive. The project intends to reduce SR 431 embankment erosion and improve storm water conveyance. The storm drain alignment will traverse NDOT right-of-way, the private property at 699 Hogan Court, and Washoe County ROW. The project is in collaboration with NDOT, Washoe County, NTCD, and private property owners of 699 Hogan Court.

Planning/Design
2024
2025
2026
$350,000

Meghan Kelly (mkelly@ntcd.org)
08/27/2025
08/27/2025
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

Organizations
Nevada Tahoe Conservation District (NTCD) Meghan Kelly - Nevada Tahoe Conservation District (NTCD)

EIP Details

EIP Basics

01.01.01.0220 - Hogan Court Drainage Improvement Project

This project is on the EIP 5-year list.

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$350,000
$350,000
$0

Total
Nevada Department of Transportation (NDOT) $350,000 $350,000 $0
Grand Total $350,000 $350,000 $0

Reported Expenditures

Reported Expenditures

No expenditures have been reported for this project.

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • Decrease point source erosion and sediment load from surface runoff by connecting existing NDOT outlet to storm drain system.

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes

No notes entered.