Overview

Basics

Basics
Project will be separated into 3-4 areas (a - residential, b - Industrial/DOT yards, c - Caltrans HWY 89 + Class 1 Bike Trail); Project will infiltrate and/or treat runoff from County and Caltrans right-of-way before it discharges into the Upper Truckee River. Stabilize eroding cut slopes with vegetation and/or rock protection; stabilize existing drainages with road and where feasible, with bio-engineering techniques; stabilize existing roadside drainages by installing curb and gutter or rock-lined channels and vegetated swales. Capture road sand/cinders and sediment in sediment trapping devices. Evaluate effectiveness of proposed improvements through preconstruction

Completed
2009
2012
$1,080,700

Donaldo Palaroan (donaldo.palaroan@edcgov.us)
06/01/2014
06/18/2015
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

01.01.01.0029 - Christmas Valley Erosion Control Project - Phase 2A
708

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
No
Capital

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures

No expected performance measures set for this project.

Reported Performance Measures

Reported Performance Measures
Miles of Roads Decommissioned or Retrofitted
2009 Total Units
Property Ownership Road Type Treatment Type
El Dorado County Paved Retrofitted 2.3 2.3 miles
Total 2.3 2.3 miles
Miles of Street Sweeping
2009 Total Units
Equipment Type Property Ownership
High-Efficiency Vacuum-Assisted Dry Sweeper El Dorado County 2.3 2.3 miles
Total 2.3 2.3 miles

No accomplishments to report for:
Year(s) 2010, 2011, 2012, 2013, 2015
Explanation Implementation complete in 2009.

Funding

Expected Funding

Expected Funding
$1,080,700
$1,080,700
$0

Total
Unknown or Unassigned $1,080,700 $1,080,700 $0
Grand Total $1,080,700 $1,080,700 $0

Reported Expenditures

Reported Expenditures
Total 2012 2011 2010 2009
California Tahoe Conservancy $170,700 $0 $19,700 $5,000 $146,000
Southern Nevada Public Land Management Act $906,100 $5,300 $4,300 $673,500 $223,000
WQ Mitigation Funds $3,900 $0 $0 $0 $3,900
Grand Total $1,080,700 $5,300 $24,000 $678,500 $372,900

Photos

Photos

No photos available.

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes

No notes entered.