To zoom, hold down the Shift key and drag a rectangle.
|
|
Location Information | Location Notes |
---|---|
|
City of South Lake Tahoe (CSLT) | Stan Hill - City of South Lake Tahoe (CSLT) | |||
Tahoe Regional Planning Agency (TRPA) | Kat McIntyre - Tahoe Regional Planning Agency (TRPA) | |||
U.S. Federal Highway Administration (FHWA) | Matt Ambroziak - U.S. Department of Transportation (US DOT) |
No expected performance measures set for this project.
No annual performance measure accomplishments entered for this project.
Total | |||
---|---|---|---|
Unknown or Unassigned | $1,399,087 | $1,399,087 | $0 |
Grand Total | $1,399,087 | $1,399,087 | $0 |
Total | 2008 | 2007 | |
---|---|---|---|
AQ Mitigation Funds | $503,000 | $428,000 | $75,000 |
Congestion Mitigation and Air Quality Program (CMA... | $896,087 | $882,587 | $13,500 |
Grand Total | $1,399,087 | $1,310,587 | $88,500 |
No Local and Regional Plans set for this project.
No Related Projects set for this project.
No external links entered.
04/25/2018 8:37 AM | Morgan Beryl | As a part of the South Y project, the entire traffic light system was replaced to address the lane configuration changes. Camera systems were installed on the signal masts to replace vehicle detection induction loops. The traffic signal control box was also replaced and likely does include signal synchronization capability. |