Overview

Basics

Basics
The primary intent of the project was the rehabilitation of the 0.6-mile stretch of Sierra Blvd from Palmira Avenue to Barbara Ave. The rehabilitation of Sierra Blvd included redesign of the roadway section, the addition of bike lane(s), paths, pedestrian sidewalks and the addition of streetscape improvements, including pedestrian lighting, hardscape, and landscape improvements in conjunction with a Rule 20 Utility undergrounding project that occurred in 2011-2013. The project also provides corridor water quality improvements and tie-in with the erosion control improvements surrounding the project area. The Complete Streets project provides a major link between the Greenway and U.S 50.

Completed
2013
2019
2019
$6,827,972

Stan Hill (shill@cityofslt.us)
12/21/2016
02/16/2023
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes
Sierra Blvd Complete Streets Project extends between Palmira Avenue and Barbara Avenue of Sierra Blvd, within the City of South Lake Tahoe.

Organizations

EIP Details

EIP Basics

03.02.01.0010 - Sierra Boulevard Complete Streets Project (From US Highway 50 to Barbara Avenue)

Transportation Details

Transportation Basics

Transportation Basics
Yes
Capital

Estimated Budgets

Estimated Budgets
/ Cost Type Total 2019 2018 2017 2016 2015 2014 2013
City of South Lake Tahoe General Fund (CSLT) $482,584
Preliminary Engineering $67,584 $248 $26,601 $40,735 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0
Construction $415,000 $200,000 $215,000 $0 $0 $0 $0 $0
Congestion Mitigation and Air Quality Program (CMAQ) (FHWA) $1,814,014
Preliminary Engineering $601,455 $0 $0 $0 $601,455 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0
Construction $1,212,559 $0 $1,212,559 $0 $0 $0 $0 $0
Greenhouse Gas Reduction Fund (GGRF) (Caltrans) $2,900,000
Preliminary Engineering $0 $0 $0 $0 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0
Construction $2,900,000 $0 $2,900,000 $0 $0 $0 $0 $0
South Tahoe Public Utility District (STPUD) $487,330
Preliminary Engineering $0 $0 $0 $0 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0
Construction $487,330 $0 $487,330 $0 $0 $0 $0 $0
Surface Transportation Block Grant (STBG) - California (FHWA) $1,152,049
Preliminary Engineering $0 $0 $0 $0 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0
Construction $1,152,049 $0 $1,152,049 $0 $0 $0 $0 $0
Grand Total $6,835,977 $200,248 $5,993,539 $40,735 $601,455 $0 $0 $0

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Roads Decommissioned or Retrofitted [Property Ownership: City of South Lake Tahoe], [Road Type: Paved], [Treatment Type: Retrofitted] miles
Miles of Pedestrian and Bicycle Routes Improved or Constructed [Action Performed: Constructed], [Path or Route Type: Sidewalk] 0.6 miles
Miles of Pedestrian and Bicycle Routes Improved or Constructed [Action Performed: Improved], [Path or Route Type: Class II/Bike Lane] 0.6 miles
Miles of Pedestrian and Bicycle Routes Improved or Constructed [Action Performed: Constructed], [Path or Route Type: Class I/Shared Use Path] 0.6 miles

Reported Performance Measures

Reported Performance Measures
Miles of Roads Decommissioned or Retrofitted
2019 Total Units
Property Ownership Road Type Treatment Type
City of South Lake Tahoe Paved Retrofitted 0.6 0.6 miles
Total 0.6 0.6 miles
Miles of Pedestrian and Bicycle Routes Improved or Constructed
2019 Total Units
Action Performed Path or Route Type
Constructed Class I/Shared Use Path 0.6 0.6 miles
Improved Class II/Bike Lane 1.2 1.2 miles
Total 1.8 1.8 miles
Tons of Greenhouse Gases Reduced
2019 Total Units
Type of Mitigation
Avoided Emissions 35.22 35.22 tons
Total 35.22 35.22 tons

Funding

Expected Funding

Expected Funding
$6,827,972
$6,827,972
$0

Total
City of South Lake Tahoe General Fund (CSLT) $406,460 $406,460 $0
Congestion Mitigation and Air Quality Program (CMAQ) (FHWA) $1,814,455 $1,814,455 $0
Greenhouse Gas Reduction Fund (GGRF) (Caltrans) $2,900,000 $2,900,000 $0
Integrated Regional Water Management Plan Funds (IWRMP) (California DWR) $67,727 $67,727 $0
South Tahoe Public Utility District (STPUD) $487,330 $487,330 $0
Surface Transportation Block Grant (STBG) - California (FHWA) $1,152,000 $1,152,000 $0
Grand Total $6,827,972 $6,827,972 $0

Reported Expenditures

Reported Expenditures
Total 2019 2018 2017 2016 2015 2014 2013
City of South Lake Tahoe General Fund $161,196 $93,896 $26,600 $40,700 $0 $0 $0 $0
Congestion Mitigation and Air Quality Program (CMA... $1,159,614 $640,169 $205,319 $314,126 $0 $0 $0 $0
Greenhouse Gas Reduction Fund (GGRF) $2,900,000 $2,900,000 $0 $0 $0 $0 $0 $0
Integrated Regional Water Management Plan Funds (I... $67,727 $0 $43,664 $24,063 $0 $0 $0 $0
South Tahoe Public Utility District $430,378 $430,378 $0 $0 $0 $0 $0 $0
Surface Transportation Block Grant (STBG) - Califo... $1,152,000 $1,152,000 $0 $0 $0 $0 $0 $0
Grand Total $5,870,915 $5,216,443 $275,583 $378,889 $0 $0 $0 $0

Photos

Photos

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
05/03/2016 3:20 PM Jim Marino J.M. - 5-03-16 Per TMPO Notification on 4/29/16 the Sierra Boulevard Project has been recommended for CMAQ allocation totaling $1,814,014 ($601,455 PE and $1,212,559 CON) . TMPO Board approval to occur on the 25th of May. Project will be included in the FTIP. City staff will, upon notice of formal award, prepare federal authorization (e-76) for PE phase no later than July 18, 2016. City staff will begin RFP process for design consultant in May 2016.