Overview

Basics

Basics
This is a coordinated project between Placer County, TRPA, Caltrans, and the Town of Truckee to adaptively manage basin entry roads of SR 89 and SR 267, as described within the Placer County Tahoe Basin Area Plan. Examples of Adaptive Traffic Management strategies include bus only lanes or modified lane configurations during peak travel times. Through improved operations of basin entry roads, user satisfaction improvements, congestion decreases, transit use increases, and impacts to the environment (including VMT and GHG emissions) are expected to decrease. Total project delivery costs rise to the hundreds of millions however values reflect initial phase of planning and design.

Planning/Design
2016
2024
2040
$3,000,000

Ryan Decker (rdecker@placer.ca.gov)
11/04/2016
02/28/2024
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes
Includes sections of corridors outside Tahoe basin.

Organizations

EIP Details

EIP Basics

03.02.01.0034 - Adaptive Traffic Management on SR 89 and SR 267

This project is on the EIP 5-year list.

Transportation Details

Transportation Basics

Transportation Basics
No
Capital
$3,311,439 (Using 2.50% annual inflation)

Estimated Budgets

Estimated Budgets

No budgets have been entered for this project.

Performance Measures

Expected Performance Measures

Expected Performance Measures
Pounds of Air Pollutants Removed or Avoided by Project None pounds
Tons of Greenhouse Gases Reduced None tons

Reported Performance Measures

Reported Performance Measures

Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.

Funding

Expected Funding

Expected Funding
$3,000,000
$1,625,000
$1,375,000
($3,000,000 identified as )

Total
Federal Lands Highway Funding (FHWA) $1,300,000 $0 $1,300,000
Placer County General Fund (PLCO) $500,000 $300,000 $200,000
Placer County Transient Occupancy Tax (PLCO) $1,825,000 $1,325,000 $500,000
Surface Transportation Block Grant (STBG) - California (FHWA) $1,000,000 $0 $1,000,000
Grand Total $4,625,000 $1,625,000 $3,000,000

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019 2018 2017 2016
Placer County Transient Occupancy Tax $522,773 $150,773 $46,000 $46,000 $100,000 $120,000 $60,000 $0 $0
Grand Total $522,773 $150,773 $46,000 $46,000 $100,000 $120,000 $60,000 $0 $0

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • Through improved operations of basin entry roads, user satisfaction improves, congestion decreases, and impacts to the environment (including GHG emissions) are expected to decrease.

Local and Regional Plans

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
01/09/2023 11:41 AM Ryan Decker Corridor management scope for feasibility study completed and to be implemented in 2023.
01/18/2022 11:01 AM Ryan Decker RTTP completed and planning for implementation of phase I improvements began in 2021. Phase I is planned to move into environmental and preliminary design in 2022.

*Funding secured - Placer County Assessment Fees (Traffic Impact Fees) is the correct heading. Funding placed under general fund until category created.
01/15/2021 1:40 PM Ryan Decker Expenditures are for coordination with RTTP effort and implementation of pilot project concepts.
01/16/2019 2:11 PM Morgan Beryl 2018 expenditures were for basemapping on GIS and surveying the corridors. Placer County flew them with drones.