Overview

Basics

Basics
This project constructs the shared use path from Incline (Ponderosa) to Sand Harbor. All work beyond Sand Harbor to the south is safety and water quality.  Project includes the design and implementation of water quality and erosion control features on State Route 28 from Spooner Summit to Sand Harbor State Park. The project includes source control, conveyance and treatment facilities for stormwater runoff. This project area is comprised of steep cut slopes and narrow shoulder areas for treatment.

Completed
2016
2016
2020
$53,215,261

Chris Holman (cholman@dot.nv.gov)
11/04/2016
09/22/2022
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

03.02.02.0079 - SR 28 Shared Use Path and Water Quality Improvements GMP2 - Incline Village to Sand Harbor

Lake Clarity Details

Lake Clarity Basics

Lake Clarity Basics

Urban Stormwater Questionnaire

The Urban Stormwater Questionnaire is not relevant because this project is not seeking voter-approved bond funding through the State of California consistent with the Stormwater Resource Plan (SRP).

Transportation Details

Transportation Basics

Transportation Basics
Yes
Capital

Estimated Budgets

Estimated Budgets
/ Cost Type Total 2020 2019 2018 2017 2016
Federal Lands Access Program (FLAP) (FHWA) $11,568,000
Preliminary Engineering $11,568,000 $0 $0 $0 $11,568,000 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $0 $0
Nevada Department of Transportation (NDOT) $6,405,000
Preliminary Engineering $0 $0 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0
Construction $6,405,000 $0 $0 $0 $6,405,000 $0
Nevada State Gas Tax (NDOT) $20,027,000
Preliminary Engineering $0 $0 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0
Construction $20,027,000 $0 $0 $0 $20,027,000 $0
Grand Total $38,000,000 $0 $0 $0 $38,000,000 $0

Performance Measures

Expected Performance Measures

Expected Performance Measures

Reported Performance Measures

Reported Performance Measures
Miles of Pedestrian and Bicycle Routes Improved or Constructed
2019 Total Units
Action Performed Path or Route Type
Constructed Class I/Shared Use Path 3 3 miles
Total 3 3 miles

No accomplishments to report for:
Year(s) 2016, 2017, 2018, 2020
Explanation In implementation phase. Accomplishments reported for 2019.

Funding

Expected Funding

Expected Funding
$53,215,261
$53,215,261
$0

Total
Congestion Mitigation and Air Quality Program (CMAQ) (FHWA) $114,528 $114,528 $0
Federal Lands Access Program (FLAP) (FHWA) $11,568,000 $11,568,000 $0
Incline Village General Improvement District (IVGID) $1,102,600 $1,102,600 $0
National Scenic Byways Program Funds (FHWA) $2,000,000 $2,000,000 $0
Nevada Recreational Trails Grant (NV State Parks) $148,570 $148,570 $0
Nevada State Gas Tax (NDOT) $34,543,832 $34,543,832 $0
Question 1 (NDSL) $2,317,731 $2,317,731 $0
Tahoe Fund (Tahoe Fund) $420,000 $420,000 $0
Washoe County General Fund (WACO) $1,000,000 $1,000,000 $0
Grand Total $53,215,261 $53,215,261 $0

Reported Expenditures

Reported Expenditures
Total 2020 2019 2018 2017 2016
Congestion Mitigation and Air Quality Program (CMA... $106,024 $0 $12,975 $46,635 $46,414 $0
Federal Lands Access Program (FLAP) $11,463,404 $0 $2,080,493 $3,157,810 $3,356,553 $2,868,548
Incline Village General Improvement District $1,014,509 $0 $147,572 $420,098 $446,839 $0
National Scenic Byways Program Funds $1,799,288 $0 $226,756 $762,013 $810,519 $0
Nevada Recreational Trails Grant $133,646 $0 $16,831 $56,606 $60,209 $0
Nevada State Gas Tax $33,051,692 $340,674 $4,002,959 $10,030,382 $12,765,092 $5,912,585
Question 1 $2,084,924 $0 $262,572 $883,070 $939,282 $0
Tahoe Fund $377,812 $0 $47,581 $160,022 $170,209 $0
Washoe County General Fund $899,553 $0 $113,288 $381,006 $405,259 $0
Grand Total $50,930,852 $340,674 $6,911,027 $15,897,642 $19,000,376 $8,781,133

Photos

Photos

Other Details

Watersheds

Threshold Categories

  • The project is expected to reduce vehicle trips (and corresponding GHG emissions) through construction of a shared-use path along the SR 28 corridor from US 50 to Incline Village, NV.
  • This project is expected to improve access to recreation through through construction of a shared-use path along the SR 28 corridor from US 50 to Incline Village, NV.
  • This project is expected to improve soil conditions through water quality improvements along the SR 28 corridor from US 50 to Incline Village, NV.
  • This project is expected to improve water quality through water quality improvements along the SR 28 corridor from US 50 to Incline Village, NV.

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

Notes

Notes
04/14/2021 11:31 AM Beth Vollmer Water quality improvements don't fit into PMs
07/11/2018 5:45 PM Matt Nussbaumer Use the Photos Link in the External Links for this project to view the project photo gallery.