Overview

Basics

Basics
The Rosewood Creek Continuation Project seeks to restore an area between two previously completed restorations on Rosewood Creek by constructing in channel grade controls using biostabilization and adding stormwater treatment where it is needed. The project's goals include improving water quality, riparian function, drought resilience, and terrestrial and aquatic habitat. The project completed water quality monitoring on Rosewood Creek that had been ongoing since 2002; the final report was submitted to the Bureau of Reclamation on September 30, 2023.

Completed
2016
2019
2023
$308,834

Meghan Kelly (mkelly@ntcd.org)
11/16/2017
12/07/2023
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

01.02.01.0076 - Rosewood Creek Continuation Project

Performance Measures

Expected Performance Measures

Expected Performance Measures
Linear Feet of Stream Channel Restored or Enhanced [Action Performed: Restored], [Watershed: Third Creek] 250 linear feet

Reported Performance Measures

Reported Performance Measures
Linear Feet of Stream Channel Restored or Enhanced
2019 Total Units
Action Performed Watershed
Restored Rosewood Creek 400 400 linear feet
Total 400 400 linear feet

No accomplishments to report for:
Year(s) 2020, 2021, 2022, 2023
Explanation The accomplishments for 2020, 2021, 2022 and 2023 included collecting fish survey and water quality monitoring data along Rosewood Creek, with a final water quality report due to the Bureau of Reclamation on September 30, 2023.

Funding

Expected Funding

Expected Funding
$308,834
$308,834
$0

Total
Tahoe Bonds Act (NDSL) $22,742 $22,742 $0
U.S. Bureau of Reclamation (USBOR) $286,092 $286,092 $0
Grand Total $308,834 $308,834 $0

Reported Expenditures

Reported Expenditures
Total 2023 2022 2021 2020 2019 2018 2017 2016
Tahoe Bonds Act $22,742 $0 $0 $0 $0 $22,742 $0 $0 $0
U.S. Bureau of Reclamation $286,092 $47,115 $31,175 $14,064 $22,019 $34,559 $84,815 $52,345 $0
Grand Total $308,834 $47,115 $31,175 $14,064 $22,019 $57,301 $84,815 $52,345 $0

Photos

Photos

Other Details

Watersheds

No watersheds set for this project.

Threshold Categories

  • The project would improve fish habitat by restoring 250 linear feet of stream channel.
  • The project increases riparian communities by reconnecting a floodplain.
  • The project will add treatment for stormwater from SR 28 by constructing 2 stormwater basins.
  • The project increases riparian communities by reconnecting a floodplain.

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes
12/06/2023 11:40 AM Domi Fellers The final Rosewood Creek water quality report was submitted to the Bureau of Reclamation on September 30, 2023, which finalized this project.