Location Information | Location Notes |
---|---|
Postmiles: 75.4/80.0
|
California Department of Transportation (Caltrans) | Joan Davis - California Department of Transportation (Caltrans) |
This project is on the EIP 5-year list.
Total | 2027 | 2026 | 2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | ||
---|---|---|---|---|---|---|---|---|---|---|---|
SHOPP Funds (Caltrans) | $30,480,000 | ||||||||||
Preliminary Engineering | $3,380,000 | $0 | $0 | $0 | $0 | $300,000 | $0 | $1,470,000 | $0 | $1,610,000 | |
Right of Way (aka Land Acquisition) | $5,040,000 | $0 | $0 | $0 | $0 | $2,320,000 | $0 | $2,720,000 | $0 | $0 | |
Construction | $22,060,000 | $0 | $0 | $0 | $0 | $22,060,000 | $0 | $0 | $0 | $0 | |
Grand Total | $30,480,000 | $0 | $0 | $0 | $0 | $24,680,000 | $0 | $4,190,000 | $0 | $1,610,000 |
No expected performance measures set for this project.
Reported Performance Measure Accomplishments are not relevant for projects in the Planning/Design stage.
Total | |||
---|---|---|---|
SHOPP Funds (Caltrans) | $30,480,000 | $30,480,000 | $0 |
Grand Total | $30,480,000 | $30,480,000 | $0 |
Total | 2023 | 2022 | 2021 | 2020 | 2019 | |
---|---|---|---|---|---|---|
SHOPP Funds | $4,808,281 | $0 | $2,416,534 | $1,101,036 | $1,284,959 | $5,752 |
Grand Total | $4,808,281 | $0 | $2,416,534 | $1,101,036 | $1,284,959 | $5,752 |
No watersheds set for this project.
No Related Projects set for this project.
No external links entered.
01/11/2023 2:40 PM | Judy Weber | This proposed project is located on US 50 in El Dorado County from the junction of Route 89/US 50 to Pioneer Trail. It is funded as a Major Project in the 201.010 Safety Improvement Program based on the 2018 Bicyclist Safety Improvement Monitoring (Pilot) Program and the recommendations address the identified issues along the corridor location. This project will improve roadway lighting, install green bike lane treatments, and enhance the visibility of crosswalks. The project will also improve bicycle signage throughout the project limit and install a two-stage turn queue box for bike turning movement at multiple locations for additional bicycle safety. In addition, the proposed work includes installing pedestrian hybrid beacons at midblock crossings between Truckee Road and River Drive (PM 76.3), Brockway Avenue and Blue Lake Avenue (PM 77.0), and Herbert Avenue and Ski Run Boulevard (PM 79.1). A full signalized intersection will be installed at Johnson Avenue (PM 78.8). Bicyclists operate as both vehicles and pedestrians, in most environments, depending on the context, rider abilities, availability, quality, and efficiency of the facilities. This project will |
||
12/16/2019 10:11 AM | Joan Davis | SHOPP Safety project programmed Oct 2019. Caltrans performance measure: 13 collisions reduced |