Overview

Basics

Basics
Constructed a Class I multi-use path along Lake Tahoe Blvd from Sawmill Road to the City of South Lake Tahoe city limits and connect to the Class 2 bike lanes at Viking Road. The purpose of the project was to provide access to local businesses, schools, and offices for bicyclists and pedestrians, to reduce vehicular transportation, and to enhance recreational opportunities within the Lake Tahoe Basin. This bicycle facility connected to the existing Sawmill 2 Bike Path at the Sawmill Road/ Lake Tahoe Blvd intersection.

Completed
2005
2014
2017
$1,504,524

Donaldo Palaroan (donaldo.palaroan@edcgov.us)
06/01/2014
01/17/2018
To zoom, hold down the Shift key and drag a rectangle.
Location Information Location Notes

Organizations

EIP Details

EIP Basics

03.02.02.0005 - Lake Tahoe Boulevard Bike Trail Project
991

Transportation Details

Transportation Basics

Transportation Basics
Yes
Capital

Estimated Budgets

Estimated Budgets
/ Cost Type Total 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005
AQ Mitigation Funds (TRPA) $166,027
Preliminary Engineering $166,027 $0 $0 $0 $0 $55,953 $50,112 $0 $0 $145 $0 $59,817 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
California Safe Routes to School Funds (Caltrans) $400,000
Preliminary Engineering $50,000 $0 $0 $0 $50,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $350,000 $0 $0 $0 $350,000 $0 $0 $0 $0 $0 $0 $0 $0 $0
California Tahoe Conservancy (CTC) $121,816
Preliminary Engineering $121,816 $0 $0 $0 $0 $0 $0 $0 $3,922 $0 $205 $45,856 $71,354 $479
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Congestion Mitigation and Air Quality Program (CMAQ) (FHWA) $497,663
Preliminary Engineering $128,884 $0 $0 $0 $0 $424 $0 $122,356 $1,196 $4,908 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $368,779 $0 $0 $0 $368,779 $0 $0 $0 $0 $0 $0 $0 $0 $0
Regional Surface Transportation Program Funds (RSTP) (FHWA) $181,352
Preliminary Engineering $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Right of Way (aka Land Acquisition) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Construction $181,352 $0 $0 $0 $181,352 $0 $0 $0 $0 $0 $0 $0 $0 $0
Grand Total $1,366,858 $0 $0 $0 $950,131 $56,377 $50,112 $122,356 $5,118 $5,053 $205 $105,673 $71,354 $479

Performance Measures

Expected Performance Measures

Expected Performance Measures
Miles of Trails Developed or Improved None 2 miles

Reported Performance Measures

Reported Performance Measures
Miles of Street Sweeping
2014 2015 2016 2017 Total Units
Equipment Type Property Ownership
Regenerative Air El Dorado County 1.7 1.7 1.7 1.7 6.8 miles
Total 1.7 1.7 1.7 1.7 6.8 miles
Miles of Pedestrian and Bicycle Routes Improved or Constructed
2014 2015 2016 2017 Total Units
Action Performed Path or Route Type
Constructed Class I/Shared Use Path 1.7 1.7 miles
Total 1.7 0 0 0 1.7 miles

Funding

Expected Funding

Expected Funding
$1,504,524
$1,504,524
$0

Total
Unknown or Unassigned $1,504,524 $1,504,524 $0
Grand Total $1,504,524 $1,504,524 $0

Reported Expenditures

Reported Expenditures
Total 2017 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007
AQ Mitigation Funds $166,822 $0 $477 $191 $0 $56,080 $50,112 $0 $0 $145 $0 $59,817
California Safe Routes to School Funds $417,693 $0 $0 $0 $408,047 $9,646 $0 $0 $0 $0 $0 $0
California Tahoe Conservancy $75,481 $0 $0 $0 $0 $0 $0 $0 $3,922 $0 $205 $71,354
Congestion Mitigation and Air Quality Program (CMA... $571,055 $0 $0 $0 $368,779 $424 $73,392 $122,356 $1,196 $4,908 $0 $0
Regional Surface Transportation Program Funds (RST... $278,926 $0 $1,333 $3,452 $181,352 $0 $0 $27,195 $63,982 $1,612 $0 $0
Grand Total $1,509,977 $0 $1,810 $3,643 $958,178 $66,150 $123,504 $149,551 $69,100 $6,665 $205 $131,171

Photos

Photos

Other Details

Watersheds

Threshold Categories

Local and Regional Plans

No Local and Regional Plans set for this project.

Related Projects

Related Projects

No Related Projects set for this project.

External Links

No external links entered.

Notes

Notes

No notes entered.